Pre-contract management
In the construction industry, contract management is the process of managing contracts that are made as part of the delivery of a built asset. It involves the creation, analysis and execution of contracts by the parties to those contracts to ensure operational and financial performance is maximised, and risks are minimised.
Contract management can categorised into three phases:
- Pre-contract phase.
- Contract execution phase.
- Post-award phase.
The pre-contract phase is the preparation stage. This is when ideas start to form about the project and it is described in theoretical terms. It is also when intentions are solidified and relationships begin to take shape.
Although each scenario may be different, these are some of the typical steps that may be included in the pre-contract stage.
- Survey phase. This is when the project team starts to collect survey information for the project. It may include contributions and basic options from all consultants regarding the feasibility of the project. This information can start to form a design brief around ideas provided by the client.
- Outline phase. At this point, the project team creates a concept based on the design brief requirements and provides an outline that includes input from relevant parties and authorities.
- Scheme design. This phase is when the project team shapes the agreed upon idea into a working proposition including approvals from applicable authorities.
- Detail design. During this phase, the project team has fully developed the idea for the project, including specialist design work for structures, electrical, plumbing and HVAC installations and other required services that will be provided by sub-contractors..
- Construction information. At this point, the project team prepares detailed working drawings and specifications that define all aspects of the project.
- Measurement. The project team will prepare the bill of quantities including measurements for materials and estimates of labour costs for the project.
- Tendering. This is when tender documents are prepared, tenders are sought from selected contractors and contract negotiation is undertaken.
Once these phases are complete, there is an analysis of tenders that ideally concludes with the client awarding the project to the successful contractor based on the approved design, strategy and documentation.
[edit] Related articles on Designing Buildings
Featured articles and news
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.